Section 38 road adoption
New estate roads designed to be adopted, from the first layout check to the certificate that makes them public highway.
What Section 38 is
Section 38 of the Highways Act 1980 is the agreement under which a highway authority agrees to adopt a new road once it has been built to its standards. The developer builds the road; the authority checks it at every stage; at the end of a maintenance period the road becomes public highway and the authority looks after it from then on. People call it S38 or road adoption.
Without it, the roads on a new development stay private, and the residents or a management company pay to maintain them forever. Most housebuilders, and most buyers, would rather the roads were adopted.
What's involved
- Layout check. Before the planning layout is fixed, a quick look at whether the roads can actually be adopted: widths, turning heads, visibility, gradients, bin lorry and fire tender swept paths, and the authority's own design guide. It's far cheaper to move a house at this stage than later.
- Detailed design. Horizontal and vertical alignment, levels, kerbs, construction, highway drainage, street lighting, signs and lines, landscaping within the highway, and the structures and services that sit in it.
- Technical approval. The design goes to the authority's development team and comes back with comments, usually more than once.
- The agreement. The legal agreement, the bond or cash deposit, the authority's inspection fees and commuted sums for anything the authority will have to maintain that isn't a standard road, such as lighting, trees, SuDS features or structures.
- Construction and inspection. The authority inspects as the road is built. Part-completion and final certificates follow, with a maintenance period in between.
How we help
We design estate roads for adoption and take them through technical approval, working alongside the architect and the drainage engineer so the highway, the plots and the sewers agree with each other. That includes the early adoptability check, the full technical submission, answering the authority's comments, organising the road safety audit and writing the response, and helping with the agreement and the bond estimate.
We work for housebuilders and developers directly, and as a white-label service for consultancies and local authority teams, on your templates and under your name.
Where we work
UK-wide, with offices in Yorkshire and Wales. Section 38 is national legislation; each authority has its own design guide and we work to whichever applies.
Common questions
What's the difference between Section 38 and Section 278? Section 38 adopts new roads the developer builds. Section 278 covers works to the existing public highway, such as the junction onto the main road. Most sites of any size need both. See our Section 278 page.
Does every road on the site have to be adopted? No. Private drives and shared surfaces serving a handful of homes often stay private. Which roads the authority will adopt, and on what terms, is one of the first things to settle.
What is a commuted sum? A one-off payment to the authority towards the future maintenance of something non-standard it is taking on. We wrote a plain-English explainer: Commuted sums, explained to a normal person.
When should we talk to you? Before the layout is fixed. Most of the expensive problems in adoption, a turning head that doesn't fit, a gradient that's too steep, a visibility splay through somebody's garden, are cheap to fix on a sketch and painful to fix on a planning approval.